5 MWp
600 MWh/mo
Pušteno u pogon
2025
Trošak izgradnje
€4.200.000
Built in Poduzetnička zona Lipik 3 (business zone 3). CapacityKw uses the AC figure; no separate DC/nameplate figure is published. Source describes it as having entered TRIAL operation ("probni rad") in December 2025; independent press (Glas Istre / Dnevno.hr, both dated April 2026) still describes it as "u probnom radu" alongside SE Korlat at that time. Mapped to Status='Operational' per this project's convention for a plant well past its trial start (today is 2026-07-16, ~7 months on) -- flagging that a fully-commissioned confirmation postdating April 2026 was not separately found. Coordinates: town-level (Lipik, Wikidata), not plant-exact.
Izvor podataka: https://www.hep.hr/projekti/obnovljivi-izvori-energije/neintegrirane-sunceve-elektrane/3422
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | HEP | Unclaimed |