13,54 MWp
1.433 MWh/mo
Pušteno u pogon
2025
Trošak izgradnje
€11.100.000
24,624 bifacial modules and 52 three-phase inverters, area ~200,000 m2 -- no brand is published for either the modules or the inverters on the source page, so ModuleBrand/ InverterBrand are left NULL rather than guessed. CapacityKw = 13.54 MW installed (DC), AcKw = 10 MW connection figure, per the source's own two-figure statement. Operational since November 2025 -- the 17.2M kWh/yr production figure is a stated expectation, not yet a full-year actual as of this scrape. Coordinates: village-level (Dugopolje, Wikidata), not plant-exact.
Izvor podataka: https://www.hep.hr/projekti/obnovljivi-izvori-energije/neintegrirane-sunceve-elektrane/3422