Preskoči na glavni sadržaj

☀ Solar · Operational

Sunčana elektrana Kaštelir 1

Sabadin, Croatia
Investitor:HEP

1 MWp

100 MWh/mo

Pušteno u pogon

2019

HEP's first solar plant acquired/operated outside its own thermal-plant sites -- described on the aggregate page as the only HEP solar plant in the state subsidy (feed-in tariff) system, unlike every plant below it. No separate module/inverter brand or investment figure is published for this specific phase (a EUR 2M figure is published, but for the Phase 2 expansion -- see the Kaštelir 2 row -- not this one). CapacityKw uses the AC figure; the source publishes no separate DC/nameplate figure for this plant. Coordinates: Croatian Wikipedia's "Sunčana elektrana Kaštelir" infobox (45.32764, 13.67514), cross-checked against an independent web search resolving "Sabadin" to ~45°19'31"N 13°40'27"E -- both point to the same hamlet within Općina Kaštelir-Labinci. UPDATE 2026-07-18: Solvis d.o.o.'s own reference page (https://solvis.hr/reference/?term=elektrane-na-zemlji) groups this plant together with Kaštelir II (PlantId 35, already ModuleBrand='Solvis') at a combined 3,917.8 kWp -- ModuleBrand set to Solvis here too since Solvis built both phases of the same site. CapacityKw NOT changed: this plant's 1000 + Kaštelir II's 2000 = 3000, which does not cleanly reconcile against Solvis's combined 3,917.8 figure under any obvious split -- left as an open discrepancy rather than guessed at.

Izvor podataka: https://www.hep.hr/projekti/obnovljivi-izvori-energije/neintegrirane-sunceve-elektrane/3422

Strane i prijave uloga

2
UlogaTvrtkaStatusPreuzeo/laRadnje
EPC izvođač Solvis d.o.o. Unclaimed
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.