Preskoči na glavni sadržaj

💧 Hydro · Operational

HE Ozalj 2

Ozalj, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

2,2 MW

Pušteno u pogon

1952

Tip postrojenja

Reservoir

Turbina

Kaplan

Broj jedinica

2

Pad

9,2 m

Protok

34,00 m³/s

Volumen akumulacije

0,55 hm³

Visina brane

7,5 m

Centar proizvodnje Zapad

Run-of-river dam-toe plant with daily accumulation, on the left bank of the middle Kupa in Ozalj, opposite HE Ozalj 1. Built 1952. 2 Kaplan units, 1.1MW each. Flow: HEP's own narrative text states "2x7 m3/s", but its own technical-data table states "2x17" -- used the table figure (34 m3/s) here since it is the one that reconciles with the page's stated COMBINED flow for both Ozalj plants (85 m3/s: Ozalj 1's 3x17=51 + Ozalj 2's 2x17=34 = 85 exactly; the narrative's "2x7" would total only 65, inconsistent with its own combined figure). Shares the same dam and reservoir as HE Ozalj 1 (see that row for shared dam/reservoir detail) -- net head 9.2m. Part of GHE Gojak (with HE Gojak and HE Lesce), under Centar proizvodnje Zapad -- treated as a separate row from HE Ozalj 1 per this row's own note. Coordinates are a town-level estimate (Ozalj), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-zapad/he-ozalj-1-i-2/1544

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.