Preskoči na glavni sadržaj

💧 Hydro · Operational

HE Senj

Sveti Juraj, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

216 MW

80.833 MWh/mo

Pušteno u pogon

1965

Tip postrojenja

Reservoir

Turbina

Francis

Broj jedinica

3

Pad

437,0 m

Protok

60,00 m³/s

Akumulacija

Kruščica / Gusić polje

Centar proizvodnje Zapad

HEP's single largest conventional hydro plant by annual output -- high-pressure derivation combining the entire Lika and Gacka river systems, 7km south of Senj near Sveti Juraj. Water is collected from Kruscica reservoir (via HE Sklope), diverted from the Lika into the Gacka near Otocac, then carried ~41km (tunnels + canals + pressure pipeline) via the Gusic Polje compensation basin to the powerhouse, using a net head of ~437m down to the Adriatic. 3 Francis units, 72 MW each -- a world-record turbine head (>400m) when commissioned in 1965. Average annual production ~970 GWh (max 1,474 GWh in 2014) -- roughly 10% of all HEP generation and ~20% of HEP's hydro output. Rerouting the Gacka through the Gusic Polje basin also essentially eliminated flood risk on the old riverbed toward Donja Svica. Leading plant of GHE Senj (with HE Sklope), under Centar proizvodnje Zapad. Provides ancillary services (automatic secondary regulation, tertiary regulation, black start, island operation). Coordinates are a town-level estimate (Sveti Juraj), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-zapad/he-senj/1540

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.