128 MWp
10.000 MWh/mo
Pušteno u pogon
2012
Built on a former East German air base near Templin, Landkreis Uckermark, Brandenburg. Commissioned 2012. 214 ha. Described by the source as the biggest thin-film project throughout Europe at the time. Annual production 120 GWh/yr (MonthlyMwh = 120,000/12 = 10,000.00). Investor/developer: Belectric GmbH. Coordinate converted from source DMS 53°01'54.0"N 13°32'19.0"E -- CoordPrecision = Exact.
Izvor podataka: https://list.solar/plants/largest-plants/solar-plants-germany/
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Belectric GmbH | Unclaimed |