💧 Hydro · Operational
RHE Lepenica
800 kW
22 MWh/mo
Pušteno u pogon
1985
Tip postrojenja
Pumped-storage
Turbina
Kaplan
Broj jedinica
1
Pad
18,0 m
Protok
6,20 m³/s
Akumulacija
Lepenica / Bajer
Centar proizvodnje Zapad
Reversible pump-storage plant in the Lepenica creek valley near Fuzine, between the Lepenica and Bajer accumulation lakes, part of the HE Vinodol water supply system. 0.8 MW generating / -1.2 MW pumping (CapacityKw uses the generating-mode figure). 1 reversible Kaplan unit (turbine/pump), vertical shaft. Gross head 5-20.2m; design head 17.95m turbine mode / 15m pump mode. Flow 6.2 m3/s turbine mode / 5.3 m3/s pump mode. Pumping began 1985, electricity generation began 1996 -- 1985 used here as CommissionYear per HEP's own "Godina puštanja u pogon" table field. Average annual production ~0.267 GWh. Part of "HE Gorski kotar" (with CHE Fuzine and HE Zeleni vir), under GHE Vinodol / Centar proizvodnje Zapad. Coordinates are a town-level estimate (near Fuzine), not plant-exact.
Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-zapad/rhe-lepenica/1538
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | HEP | Unclaimed |