🌀 Wind · Operational

Vjetroelektrana Kom-Orjak-Greda

Blato na Cetini, Croatia
Koordinate: približne (razina grada)

10,25 MW

2.083 MWh/mo

Pušteno u pogon

2020

Priključak na mrežu

10 MW

Located near the village of Seoca, Blato na Cetini (Omiš municipality), Split-Dalmatia County, ~17km southeast of Split. 5x Senvion MM92-2.05 turbines (2.05 MW each, 10.25 MW total -- matches HOPS installed figure exactly), hub height 80m, rotor diameter 92m (per model name). Average annual generation ~25 GWh (MonthlyMwh = 25,000/12 = 2,083.33), supplying ~7,000 households -- an older estimate from project-era material cites 28,409 MWh/yr instead, kept here as a noted discrepancy, not used. OWNERSHIP HISTORY: built by ECOwind d.o.o. (subsidiary of BayWa r.e., Germany); a June 2018 agreement to sell the plant to Zadruga za etično financiranje (ZEF), a Croatian ethical-financing cooperative offering citizen share purchases, was announced in the Croatian press at a stated ~EUR 21.74 million valuation -- but independent later reporting (Serbia SEE Energy Mining News, Global Energy Monitor) shows Austrian KELAG acquiring the plant from ECOwind on 16 December 2020, with no confirmation the ZEF deal ever closed. Current owner-of- record per the live Croatian FINA/court registry (fininfo.hr): the producer company is "VJETROELEKTRANA ORJAK d.o.o." (OIB 71215568006, founded 07.05.2012, Zagreb court register), 100%-owned by Interenergo, energetski inženiring, d.o.o. (Slovenia) -- Interenergo is KELAG's Slovenian energy-trading subsidiary, reconciling the "Austrian Kelag" acquisition reporting with the registry's Slovenian parent-of-record. The EUR 21.74m ZEF figure is NOT used as BuildCostEur -- its scope (construction cost vs. a cooperative purchase valuation) and whether that specific deal completed are both unconfirmed. No plant-specific coordinate was found in any source checked (developer site, press, GEM.wiki [blocked], OSM search) -- Lat/Lng is the Blato na Cetini settlement centroid, CoordPrecision=Approximate.

Izvor podataka: http://dajakovic.hr/en/kom-orjak-greda-wind-farm/

Izvor podataka: https://serbia-energy.eu/croatia-kom-orjak-greda-wind-farm-acquired-by-austrian-kelag/

Izvor podataka: https://www.gem.wiki/Kom-Orjak-Greda_wind_farm

Izvor podataka: https://tockanai.hr/biznis/zef-vjetroelektrana-kom-orjak-greda-12490/

Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetroelektrana-orjak/Detaljno/244556

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik Interenergo, energetski inženiring, d.o.o. Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.