🌀 Wind · Operational
Vjetroelektrana Pometeno Brdo
20 MW
Pušteno u pogon
2010
Trošak izgradnje
€33.446.148
Priključak na mrežu
20 MW
The first Croatian wind farm to use wind turbines designed AND manufactured in Croatia (Koncar's own KO-VA 57/1 and K80 models) -- located above Konjsko village near the A1 Konjsko tunnel, between Split and Dugopolje. 17 turbines total: 15x Koncar KO-VA 57/1 (1.0 MW each) + 2x Koncar K80 (2.5 MW each) = 20.0 MW exact. Hub height 60m (source figure, applies to the wind farm generally, not confirmed per-model); rotor diameter not stated for either model in any sourced material, left NULL rather than inferred from the "57" in the KO-VA model name. COMMISSIONING DISCREPANCY: HOPS's official report states multi-phase commissioning in 2010/2011/2012/2015. Independent sourcing (Hrastovic Inzenjering) only corroborates: Phase 1 (6 units) 24 Feb 2012, Phase 2 (1st K80 prototype) Jul 2012, Phase 3 (9 more units) 1 Jan 2013, Phase 4 (2nd K80) 2015 -- no 2010 or 2011 phase found in any independent source despite searching. CommissionYear stored as 2010 (HOPS's earliest stated year) but this gap is real and unresolved, not silently picked. CITY NOTE: HOPS's own municipality field for this plant reads "Split," but the actual turbine site (Konjsko) is administratively part of Opcina Klis, not Grad Split (per hr.wikipedia.org/wiki/Konjsko_(Klis) and klis.hr) -- City='Split' here matches the HOPS ground-truth field per this import's brief, not a claim about municipal boundaries. Investment: 252,000,000 HRK (Koncar contributed 41.48% of its own resources; 14 Koncar group companies + 15 Croatian subcontractors built it) -- converted here to EUR 33,446,148 at the fixed EUR/HRK peg (7.53450), a currency conversion of a sourced pre-euro figure, not an estimate. OWNERSHIP: Hrote's 2022 snapshot recorded the producer as "KONCAR-OBNOVLJIVI IZVORI d.o.o." (OIB 83974943314). That company underwent a corporate split effective 1 July 2024, spinning out a dedicated single-purpose company "Energetski park Pometeno brdo d.o.o." (OIB 96510732278, same Fallerovo setaliste 22, Zagreb address), wholly owned by KONCAR - Obnovljivi izvori d.o.o. -- same "Energetski park <name> d.o.o." naming convention already used for HEP Korlat (migration 018). No annual production (GWh) figure was found anywhere -- MonthlyMwh left NULL.
Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrana_Pometeno_Brdo
Izvor podataka: https://www.hrastovic-inzenjering.hr/primjena-energije/energetski-clanci/energijske-tehnologije/item/243-vjetroelektrana-pometeno-brdo.html
Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/koncar-obnovljivi-izvori/Detaljno/104584
Izvor podataka: https://infobiz.fina.hr/tvrtka/energetski-park-pometeno-brdo-d-o-o/OIB-96510732278