144 MW
40.000 MWh/mo
Pušteno u pogon
2021
Priključak na mrežu
142 MW
HOPS official monthly report: installed 144 MW, approved connection 142 MW at 220 kV, operational since 2021 (test operation from 2019). Ervenik municipality, near Knin, Šibensko-kninska County -- Croatia's largest wind farm, 48 turbines across ~2,000 hectares. CAPACITY DISCREPANCY FLAG: every independent public source checked (hr.wikipedia raw table, Global Energy Monitor, OpenInfraMap, multiple press articles) consistently reports 142 MW as this plant's capacity, not 144 MW -- HOPS's 144 MW installed figure is used here per the ground-truth instruction for this import, but the gap vs. every other source is noted rather than silently absorbed. Turbines: 48x Nordex (brand confirmed via hr.wikipedia's own wind-farm table; specific submodel e.g. N117/N131 NOT found despite searching -- left unspecified rather than guessed). Press reports 132m tower height / ~200m blade-tip height, which would imply a rotor radius around 68m, but this is an indirect back-calculation from imprecise press language (tower vs. hub height are not necessarily the same figure) -- NOT stored as HubHeightM/RotorDiameterM to avoid fabricating a derived number; both left NULL. Predicted annual production 480 GWh/yr per hr.wikipedia's table (marked "predviđeno" = projected/design figure, not a confirmed measured actual) -- MonthlyMwh = 480,000/12 = 40,000.00, flagged here as a projected rather than measured figure. Owner: C.E.M.P. d.o.o. (OIB 80708915943, MB 01743392, Trgovačka ulica 3, Donji Stupnik, founded 2003, large enterprise) -- exact match to the Hrote producer record. 100%-owned per Global Energy Monitor by Lager Group -- Croatian press (tportal, tris.com.hr, forbes.n1info.hr) identifies the controlling businessman as Milenko Bašić (Posušje, Bosnia and Herzegovina). Note: this project has been the subject of extensive Croatian press coverage re: unpaid municipal utility fees to Ervenik/Knin and a 2024 USKOK arrest-related investigation -- purely reputational/legal context, not incorporated into any stored field. TWO-PHASE NOTE: this project's own dbo.Hrote table has TWO registrations under producer "C.E.M.P. d.o.o." ("Vjetroelektrana Krs Paene" and "Vjetroelektrana Krs Paene-Prosirenje" [expansion]), consistent with HOPS's single 144 MW entry representing both phases combined.
Izvor podataka: https://www.gem.wiki/KRS-Padene_wind_farm
Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrane_u_Hrvatskoj
Izvor podataka: https://openinframap.org/stats/area/Croatia/plants/-10180789
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | C.E.M.P. d.o.o. | Unclaimed |