9,2 MW
2.500 MWh/mo
Pušteno u pogon
2013
Priključak na mrežu
9 MW
HOPS official monthly report: installed 9.2 MW, approved connection 9.2 MW at 10 kV, operational since 2013 (Phase 1 only, matching this HOPS figure exactly). Located along the Benkovac-Karin Donji road, northeastern Bukovica karst, Zadar County. 4x Siemens SWT-93 2.3MW = 9.2 MW. FLAG: one press source states rotor diameter "108 meters" for these turbines, but Siemens' own "SWT-93" model designation denotes a 93m rotor by naming convention -- used 93m (matching the model name) and treated the 108m figure as a likely source/transcription error, NOT stored. Annual production ~30 GWh/yr, supplying "over 6,500 households" (MonthlyMwh = 30,000/12 = 2,500.00). Investment: 360 million HRK total (120m Phase 1 + 240m planned Phase 2), 30% equity / 70% HBOR+ Zagrebačka banka credit -- a pre-euro HRK figure from a 2013 article; NOT converted to EUR (left BuildCostEur NULL) to avoid presenting a computed-looking figure alongside genuinely EUR-sourced values elsewhere in this DB -- driver may wish to convert at the fixed 7.53450 rate if that becomes this DB's convention. A further 6-turbine/18 MW Phase 2 was planned per the source article but is NOT reflected in HOPS's 9.2 MW figure and not imported. Owner: Eko Zadar Dva d.o.o., Benkovac (private company) -- no Hrote match found for this producer name (noted as expected per your brief).
Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrana_Zadar_4
Izvor podataka: http://www.energetika-net.com/vijesti/obnovljivi-izvori-energije/eko-zadar-dva-gradi-vjetroelektranu-u-bukovici-16696
Izvor podataka: http://www.057info.hr/gospodarstvo/2013-04-15/eko-zadar-dva-podize-vjetroelektranu-za-360-milijuna-kuna
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Eko Zadar Dva d.o.o. | Unclaimed |