💧 Hydro · Planned

HE Trbovlje

Trbovlje, Slovenia
Koordinate: približne (razina grada)

32,5 MW

10.335 MWh/mo

Tip postrojenja

Run-of-river

PLANNED, NOT BUILT -- same National Spatial Plan project as HE Suhadol/HE Renke, no construction-start date on source. Design capacity 32.5 MW (2 x 16.25 MW); projected average annual production 124.02 GWh/yr -> MonthlyMwh = 124,020/12 = 10,335.00 (design/projected figures, not measured). Located approx. 1.2km upstream of the bridge over the Sava in Trbovlje (near the Fishing Club/Ribiški dom). Part of the same 3-plant Middle Sava chain described in HE Suhadol's Notes. Coordinates are a Trbovlje town-centre estimate (Wikipedia infobox), not the exact dam-site location, which the source places ~1.2km upstream of the town bridge.

Izvor podataka: https://www.hse.si/en/hse-projects/middle-sava-hpp/

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik Holding Slovenske Elektrarne d.o.o. Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.