💧 Hydro · Planned
HE Trbovlje
32,5 MW
10.335 MWh/mo
Tip postrojenja
Run-of-river
PLANNED, NOT BUILT -- same National Spatial Plan project as HE Suhadol/HE Renke, no construction-start date on source. Design capacity 32.5 MW (2 x 16.25 MW); projected average annual production 124.02 GWh/yr -> MonthlyMwh = 124,020/12 = 10,335.00 (design/projected figures, not measured). Located approx. 1.2km upstream of the bridge over the Sava in Trbovlje (near the Fishing Club/Ribiški dom). Part of the same 3-plant Middle Sava chain described in HE Suhadol's Notes. Coordinates are a Trbovlje town-centre estimate (Wikipedia infobox), not the exact dam-site location, which the source places ~1.2km upstream of the town bridge.
Izvor podataka: https://www.hse.si/en/hse-projects/middle-sava-hpp/