☀ Solar · Operational
SPP Prapretno
3,04 MWp
280 MWh/mo
Pušteno u pogon
2021
Source (HSE): summary-table capacity 3,036 kWp (3.036 MW); detail section confirms via module math: 6,902 monocrystalline modules x 440 Wp = 3,036,880 W = ~3.037 MWp -- a trivial rounding match, not a real discrepancy. Annual production 3,362 MWh/yr (3.362 GWh) -> MonthlyMwh = 3362/12 = 280.17. Ground-mount on the recultivated/closed part of the Prapretno non-hazardous waste landfill near Hrastnik -- press coverage independently confirms the site (a former ash/slag disposal ground for the defunct Trbovlje thermal power plant, "in a depression between Trbovlje and Hrastnik"), described by HSE as the largest solar power plant in Slovenia at time of writing. Notable siting: brownfield/landfill reuse, not a typical greenfield ground-mount; covers an area of about 4.5 football fields. 20 deg incline, south-facing. Coordinates are the named settlement "Prapretno pri Hrastniku" (Municipality of Hrastnik) -- the actual ash-landfill footprint may sit somewhat off this hillside-settlement point, down in the Trbovlje/Hrastnik valley; settlement-level estimate, not an exact ash-field centroid.
Izvor podataka: https://www.hse.si/en/hse-projects/solar-power-plant/
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Holding Slovenske Elektrarne d.o.o. | Unclaimed |