☀ Solar · Operational
SPP Zlatoličje
777 kWp
74 MWh/mo
Pušteno u pogon
2011
Source (HSE): summary-table capacity 777 kWp. Detail section breaks this into 4 segments: 68.25 kWp (engine-room flat roof, 20 deg incline, 0 deg south) + 25.5 kWp (garage roof, 11 deg incline, 0 deg south) + 635 kWp (ground-mount on the banks of the HPP's drainage/outflow canal, 35 deg incline, -10 to +5 deg south) + 48 kWp (flat surface, south side of engine room, 35 deg incline, 0 deg south) = 776.75 kWp -- a trivial rounding match to the table's 777, not a real discrepancy. Annual production 893 MWh/yr (0.893 GWh) -> MonthlyMwh = 893/12 = 74.42. Majority of capacity (635 of 776.75 kWp, ~82%) is ground-mount on the outflow-canal bank; remainder is roof-mount on plant buildings -- InstallType set to Ground-mount to reflect the majority, roof segments noted here. Located at HE Zlatoličje (Drava, near Maribor). Grid: 20kV transformer station TP 20/0.4kV Zlatoličje.
Izvor podataka: https://www.hse.si/en/hse-projects/solar-power-plant/
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Dravske elektrarne Maribor d.o.o. (HSE Group) | Unclaimed |