💧 Hydro · Operational

HE Kraljevac

Zadvarje, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

46,4 MW

Pušteno u pogon

1912

Tip postrojenja

Reservoir

Turbina

Francis

Broj jedinica

4

Pad

110,0 m

Protok

55,00 m³/s

Visina brane

18,0 m

Centar proizvodnje Dalmacija

High-head derivation plant on the Cetina at Zadvarje, part of GHE Zakucac. Main units A+B 41.6MW plus a small ABM unit C (4.8MW, added 1990-91) -- aggregated per this project's composite-plant convention. Gravity dam 25m long / 18m high, with a 180m bypass tunnel (48 m2 cross-section). Combined main flow 2x25 m3/s plus 5 m3/s for the ABM unit. HEP's technical-data table's turbine count includes a decommissioned unit alongside the current 3 Francis + 1 Francis ABM. Historical average production has varied by era: 471 GWh (1960 record year), 137 GWh (1961-1980 average), 16.3 GWh (1981-1990 average) -- no single current-era average stated. First built 1912, expanded 1932, ABM added 1990-91. Coordinates are a town-level estimate (Zadvarje), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-jug/he-kraljevac/1557

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.