237 MW
29.420 MWh/mo
Pušteno u pogon
1973
Tip postrojenja
Reservoir
Turbina
Francis
Broj jedinica
3
Pad
380,0 m
Protok
69,90 m³/s
Akumulacija
Buško Blato / Lipa
Volumen akumulacije
800,00 hm³
Centar proizvodnje Dalmacija
High-head reservoir derivation plant, part of GHE Orlovac. 3 main Francis units (3x79MW = 237MW) plus 1 small 1MW Pelton "house" auxiliary unit not counted in HEP's technical-data table's turbine tally. Combined main flow 3x23.3 m3/s. Linked to the Busko Blato reservoir (800 hm3, mostly in Bosnia-Herzegovina) via the Lipa compensation basin and a 12,100m headrace tunnel (dia. 5.5m) shared with CS Busko Blato's pumping station. Average annual production ~353 GWh. Coordinates are a town-level estimate (Ruda, near Trilj), not plant-exact.
Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-jug/he-orlovac/1552