Preskoči na glavni sadržaj

💧 Hydro · Operational

HE Miljacka

Kistanje, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

24 MW

10.170 MWh/mo

Pušteno u pogon

1906

Tip postrojenja

Reservoir

Turbina

Francis

Broj jedinica

4

Pad

102,0 m

Protok

30,00 m³/s

Akumulacija

Brljan

Volumen akumulacije

4,00 hm³

Centar proizvodnje Dalmacija

Run-of-river plant on the Krka with daily-accumulation reservoir (Brljan lake, 4 hm3), part of GHE Miljacka. One of Croatia's oldest operating hydro plants (1906). 4 Francis units (1x4.8MW + 3x6.4MW = 24MW nameplate, though HEP's technical-data table separately lists only 20MW as "currently available"). Combined flow 30 m3/s (3x8 + 1x6). Average annual production ~122 GWh (max 147 GWh in 1974). Coordinates are a town-level estimate (Kistanje, near the Krka), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-jug/he-miljacka/1547

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.