🌀 Wind · Operational

Vjetroelektrana Korlat

Benkovac, Croatia

63 MW

13.417 MWh/mo

Pušteno u pogon

2021

Trošak izgradnje

€67.000.000

Priključak na mrežu

58 MW

HEP's first wind farm, operational since April 2021. 18 Nordex turbines, ~161 GWh/year average (supplies roughly 50,000 households). Has no HROTE-subsidised feed-in tariff -- the first Croatian wind farm to sell purely at market prices instead of a guaranteed feed-in rate. Infrastructure and grid-connection works by Ing-Grad; construction management and supervision by Fractal. CAPACITY UPDATE (2026-07-20): HOPS's official August 2025 monthly wind-generation report lists this plant's installed capacity as 63 MW, not the 64.8 MW (18 x 3.6 MW nameplate arithmetic) sourced from HEP's own project page -- HOPS's approved-connection figure (58 MW) matches this row's existing GridConnectionKw exactly, so only the installed-capacity figure disagreed. Per user decision, HOPS (the actual grid operator) is treated as authoritative for installed capacity; CapacityKw updated from 64,800 to 63,000. The original 64.8 MW nameplate figure is preserved here, not deleted, since it is itself a real sourced fact, just apparently not what HOPS has on file for grid-registered capacity.

Izvor podataka: https://www.hep.hr/projekti/obnovljivi-izvori-energije/vjetroelektrana-korlat/3468

Izvor podataka: https://www.hops.hr/page-file/iU9F93e5gaz2MDcx04vWw0/reports-wpp/HOPS%20-%20Mjese%C4%8Dni%20izvje%C5%A1taj%20o%20proizvodnji%20VE%20u%20HR%20za%20Kolovoz%202025.pdf

Strane i prijave uloga

2
UlogaTvrtkaStatusPreuzeo/laRadnje
EPC izvođač Nordex Unclaimed
Vlasnik Energetski park Korlat d.o.o. Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.